📋 Job / NEC
Job Name
Work Order #
Conductor
Show UG conduit
0
Routes
0
Total Ft
$0
Est Cost
0
Pedestals
Easement trench ≤ 10'
Rule hard limit
PENDING
OH outside easement
DISALLOWED
PENDING
Pedestals after UG road crossings
REQUIRED
PENDING
Auto routes
🧠 Geolocation Parameters
Coupling (routes → μ)
1.00
Emitter sharpness (σ)
0.080
Surface amplitude (kzScale)
18.0
Base μ
0.95
Wireframe

📷 Photo Facilities

No photos yet
The NEC grid is the upper Fermi sheet. Photo facilities (poles, peds, risers, fences) are detected by AI and projected onto the surface with existing infrastructure.